Home
/

Application · Landfill leachate

Pretreatment before UF/RO.

ELETTROFLOTTAZIONE® is proposed as a modular upstream stage for variable landfill leachate: it targets suspended and colloidal matter, emulsified fractions and separable metals before the membrane train.

01LEACHATEVARIABLE FEED
02ETFPRETREATMENT
03UF / ROMEMBRANE TRAIN

01 · Process challenge

Membrane performance begins upstream.

Landfill leachate is a variable matrix containing dissolved and suspended organics, humic substances, ammoniacal nitrogen, salts, solids and metals. Age, rainfall, recirculation and landfill operation can change its composition over time. A single treatment stage is therefore rarely sufficient for every separation objective.

01

Colloids and turbidity

Fine and destabilised particles can increase the fouling load reaching UF and RO.

02

Emulsified fractions

Hydrophobic and emulsified compounds may be difficult to control through coarse mechanical filtration alone.

03

Variable feed

Changes in concentration and composition can shift pressure, flux, cleaning frequency and recovery.

04

Membrane protection

Pretreatment should reduce avoidable load while preserving UF/RO as the final separation barrier.

02 · Integrated treatment train

A complementary process architecture.

The exact configuration is defined from representative samples and pilot evidence. The scheme below describes the intended functional position of the ETF stage.

01EqualisationRepresentative, homogenised feed
02ELETTROFLOTTAZIONE®Destabilisation, aggregation and flotation
03Solid/liquid separationFloated and settled solids management
04UF / ROMembrane finishing and water recovery

03 · Engineering targets

What the pretreatment is designed to improve.

01

Lower particulate load

Reduce suspended and colloidal matter transferred to downstream filtration.

02

More stable operation

Limit feed variability that can translate into unstable membrane operating conditions.

03

Controlled sludge line

Concentrate separated matter in a dedicated, measurable solids stream.

04

Modular integration

Interface the ETF section with existing or new containerised membrane plants.

04 · Validation pathway

Demonstrate first. Size afterwards.

Performance depends on the actual leachate, electrode configuration, current density, hydraulic retention time and downstream objectives. No industrial guarantee should therefore be based on generic literature values alone.

  1. 01
    Representative characterisation

    Define variability, analytical baseline and membrane constraints.

  2. 02
    Laboratory screening

    Identify a technically credible operating window on the actual liquid.

  3. 03
    ETF pilot-unit campaign

    Verify continuous operation, mass balance, sludge behaviour and downstream water quality.

  4. 04
    Industrial scale-up

    Translate validated data into capacity, redundancy, electrical power and interfaces.

05 · For membrane-system integrators

Add a qualified pretreatment module to your UF/RO package.

The collaboration can include application screening, test planning, process design, ETF module supply, P&ID interfaces, commissioning, training and performance verification. Project-specific integration keeps the membrane supplier in control of the complete treatment line while preserving specialist ETF know-how.

Request a confidential technical assessment

06 · Independent technical basis

Selected scientific references

Published research supports combined electrochemical and membrane processes for complex wastewater and landfill leachate. Site-specific testing remains necessary before selecting or guaranteeing an industrial configuration.